1、Terrain and installation. Built on a slope with large level changes and narrow paths, fixtures had to be carried in by hand, with mounting points kept clear of tree roots and visitor routes.
2、Power supply. Original distribution was sized for daytime use. Dozens of new fixtures meant recalculating load, voltage drop and three-phase balance.
3、Electrical and signal. Mountain screening weakened wireless links; DMX512 / Art-Net had to be zoned with amplification and a fibre backbone to avoid mid-show blackouts.
4、Environmental durability. Heat, humidity, long rainy seasons and salt spray near water defeat ordinary IP20 fixtures through ingress, fogging and corrosion.
5、Show control and programming. Multiple fixture types had to sync to the millisecond, with separate programmes for weekdays, weekends and holidays.
6、O&M and acceptance. Distributed, high-level mounting raised service cost; the client and supervisor required complete IP, electrical and laser safety documentation.
7、Safety risk. Beams had to stay clear of crowds and flight paths, glare kept off walkways, with emergency stop and zoning designed in from the start.